Job Completed for Sewer Line Backup in Union

Completion Date: 2020-02-06

Customer Type: n/a

Location: Union, NJ

About this project:

This home experienced a blockage in the main sewer line causing sewage to back up into the unfinished basement. The sewage affected the concrete floor, structural lumber, and content. The cleanup required two technicians for two hours to set up one dehumidifier, one air scrubber, and four air movers. The basement was dried and the equipment was picked up after three days